Leak-Tight Versus RTO Requirement Sorter¶
Run the Leak-Tight Versus RTO Requirement Sorter MicroSim Fullscreen
This p5.js sketch is built on the shared FanPedia MicroSim kit. To run it in the
p5.js editor, add the kit files (fanpedia-sim.css, fanpedia-core.js and
fanpedia-p5.js from
../shared-libs/,
or their published URLs) to the editor's index.html before pasting the sketch.
About This MicroSim¶
FanPedia's nominally leak-tight page (p. 120) and its RTO page (p. 121) share most of their lines, which is why the two options blur together. This MicroSim deals twelve requirement cards, one at a time, in a shuffled order that is the same for every learner (seed 21). For each card you choose a bin, Leak-Tight Only, Both or RTO Only, and lock the placement. A locked card cannot be moved.
| # | Requirement | Bin |
|---|---|---|
| 1 | Solid drive side on housing (no drive plates) | Both |
| 2 | Not recommended for applications over 600°F | Both |
| 3 | Bolted connections on 3 in. to 4 in. centers | Both |
| 4 | Centering plates if the housing is split | Both |
| 5 | Soap bubble test at the shop, recorded on the inspection form | Both |
| 6 | Arrangements 1, 8 and 9 only | Leak-Tight Only |
| 7 | Shaft seal: lip, Graphoil stuffing box, or double carbon ring | Leak-Tight Only |
| 8 | Drain: pipe coupling type with plug | Leak-Tight Only |
| 9 | Silicone sponge gasket and silicone caulk, with an alternative on automotive jobs | RTO Only |
| 10 | Dampers, if required, must have stuffing boxes | RTO Only |
| 11 | Sales must specify VFD, cycling and bake-out conditions | RTO Only |
| 12 | Shaft seal: friction, single carbon ring, or commercial carbon ring | RTO Only |
A correct placement reads "✓ Correct:
After the twelfth card, a summary lists your score, the mastery line and any missed cards with their right bins. Compare the two lists then shows the leak-tight and RTO lists side by side, with the five shared requirements linked across the middle.
Requirements and wording come from FanPedia p. 120 (nominally leak-tight) and p. 121 (RTO), 2021 edition, as summarized in Chapter 21.
How to Use¶
- Read the requirement card and decide which construction calls for it.
- Choose a bin: press 1 Leak-Tight Only, 2 Both or 3 RTO Only (the selected bin is outlined). You can change your choice until you lock.
- Press Lock placement. Read the verdict and the reason, then press Next card.
- After the twelfth card, press Finish, read the summary, and press Compare the two lists. Count the linked rows: 5 of the 12 requirements are shared. Show the bins returns to your placements.
- Start over deals all twelve cards again (in a new order, the same for every learner) and clears the score.
Keyboard: keys 1, 2 and 3 choose a bin; Enter locks the placement, then goes to the next card; Tab reaches every button.
Data label: "Source: FanPedia p. 120 (leak-tight) and p. 121 (RTO)", shown at the bottom left of the drawing.
Iframe Embed Code¶
You can add this MicroSim to any web page by adding this to your HTML:
<iframe src="https://moroshek.github.io/FanTASTIC-textbook/sims/ch21-leak-tight-rto-sorter/main.html"
height="569px"
width="100%"
scrolling="no"></iframe>
Lesson Plan¶
Learning Objective¶
The learner will differentiate FanPedia's nominally leak-tight and RTO construction requirements by sorting 12 requirements into Leak-Tight Only, RTO Only, or Both, with at least 10 of 12 correct on the first attempt (Bloom: Analyze, verb: differentiate).
Audience¶
Adult professional development: new application engineers, sales staff, representatives and facilities staff.
Duration¶
10-15 minutes
Prerequisites¶
- Fan leakage, nominally leak-tight fan, gasketing (Chapter 21)
- Continuous seal weld, centering plate, soap bubble test (Chapter 21)
- Regenerative thermal oxidizer and RTO service conditions (Chapter 21)
Activities¶
- Sort (6 min): Place all twelve cards. Before locking, say which page the requirement is on.
- Review (3 min): Read the summary. For each missed card, name the question a salesperson should have asked.
- Compare (4 min): Open the side-by-side lists. Write down the shared core once, then the three leak-tight-only and four RTO-only lines.
Common Misconceptions Addressed¶
- RTO construction is just leak-tight construction under another name. The comparison view shows seven requirements that belong to only one list.
- Leak-tight fans may be any arrangement. The Arrangements 1, 8 and 9 card belongs in Leak-Tight Only.
- Silicone gasketing is acceptable on every RTO job. The silicone card includes the automotive alternative and belongs in RTO Only.
Assessment¶
- First-attempt score shown in the summary as "First-attempt score: n of 12"; mastery is 10 of 12 on the first attempt.
- Follow-up question: an RTO builder serving an automotive paint shop asks for "leak-tight construction". Which lines from each list go on the order?
References¶
- FanPedia: The Fan & Blower Encyclopedia (PDF) - Twin City Fan & Blower; p. 120 (nominally leak-tight fans) and p. 121 (regenerative thermal oxidizer construction).
- FanPedia online - Twin City Fan & Blower's online version of the encyclopedia.
- Chapter 21: High Temperature, Leak-Tight and RTO Construction - the "Nominally Leak-Tight Fans" and "Regenerative Thermal Oxidizer (RTO) Service" sections.
- Regenerative thermal oxidizer (Wikipedia) - background on how an RTO destroys pollutants and reverses flow through its ceramic media.